University Council on Technology Ad Hoc Subcommittee
on Procedures for Review of the Networking and Information Systems Study
(NISS) and the Academic Computing Study (ACS).
At the University Council on Technology meeting of October 24, Ilee
Rhimes, Chief Information Officer and Interim Vice-President for Business
and Finance requested that UCT establish an ad-hoc subcommittee to
to make recommendations on the procedure to be followed in conducting
a review of the Networking and Information Systems Study (NISS) and the
Academic Computing Study (ACS).
Those nominated to the subcommittee were Cathy Bakes, James Boyd,
Lowell Croskey, Paul Farrell, Terry Kuhn, Mike Lee, Roberta Sikula,
and Don Tolliver. Dewitt Latimer, Bruce Petryshak and Greg Seibert
were added as resource persons.
The subcommittee was charged, in particular, with considering:
- Whether a facilitator would enhance the process?
- Whether one or two committees should be formed?
- What the composition of the committee or committees should be?
At the meeting of October 24 it was also suggested that the subcommittee
consider the appropriateness of the inclusion of surveys and/or focus groups in
the procedure.
The committee was further charged to report back to UCT with recommendations
on these matters and others at the meeting of UCT on Friday 21 November.
The subcommittee met at 3:30pm on Wednesday 5 November. Present were
Cathy Bakes, James Boyd, Lowell Croskey, Paul Farrell, Terry Kuhn,
Mike Lee, Roberta Sikula, Dewitt Latimer, Greg Seibert and Steve Tapp.
After some discussion at the meeting and subsequent e-mail exchanges
the committee decided to recommend as follows.
- That the process of reviewing the Networking and Information Systems Study
(NISS) and the Academic Computing Study (ACS) was a straightforward one
requiring
- the determination of what recommendations had been implemented
and the impact and degree of success of the implementation
- the determination of what recommendations were still outstanding
and whether these were still appropriate given developments since the
studies.
- Therefore a facilitator was not required.
- That, since the ultimate aim is to produce a unified report and furthermore
many of the issues in the two reports are common, that one committee should
be formed to review both reports. This committee might divide into
working groups to review aspects of the two reports, but the final report
should be a single document.
- That the committee should also consider other reports, specifically
the Distance Learning Policy Recommendations, and also the Intra Building
Wiring Report and the Telecommunications Study Report.
- That the committee should also be charged with enumerating and accumulating
source material on other initiatives embarked on since the NISS and ACS
studies, including those completed or in progress, and also on other
initiatives planned for the immediate future. In all these cases,
the committee should review the current status, the commitments made,
and the project completion date and outcomes.
Such initiatives include:
|
Project | Status
|
|
Backbone Fiber Update - Phase I | Completed
|
|
Backbone Fiber Update - Phase II | Awarding Contract
|
|
ResNet | Completed by 1/98
|
|
Intra-building Wiring- Phase I & II | Design Just Beginning
|
|
Music and Speech Wiring | Awarding Contract
|
|
Science Research Building Wiring | Design Just Beginning
|
|
Additional Vtel Systems (9) | Completed by 9/98
|
|
Telephone Switch | Completed by 9/99
|
|
All Campus Card Projects | Completed by 9/98
|
|
Campus Backbone Router Upgrade | Completed by 1/98
|
|
Moulton Hall Technology - Phase I | In Progress |
- That the committee should be formed primarily of members of UCT with
some members from the previous studies to provide experience and expertise.
- Since the process is primarily one of review, the objectives could
be accomplished by a committee without the necessity of formal focus
groups or a survey, although informal focus groups might be convened
to aid in areas where the committee did not have sufficient expertise.
There was no consensus on the issue of whether surveys should be
conducted both during the review and during the production of the
integrated plan or only at one time. One suggestion is that there should
be a concise survey as part of the review and a more comprehensive survey
as part of the production of the integrated plan.
- There was strong feeling that consideration should be given to shortening
the timeline for the review so that completion would be in late February
or March 1998.
Although recommendations for the integrated plan were technically outside
the charge of the subcommittee, considerable discussion also took place
on that issue. The vast majority of committee felt that the timetable
for the integrated plan should also be accelerated. There was also some
feelings that the integrated plan could be accomplished without the
aid of a facilitator.
File translated from TEX by TTH, version 1.0.